Gromax eliminates vendor complexity by providing stamping, finishing, and assembly under one roof—reducing handling, speeding delivery, and ensuring every part meets performance, cosmetic, and compliance standards.
From deburring to plating, fastener installation to marking, we deliver fully finished, production-ready parts for seamless integration into your assembly line.
High-precision stamping for prototypes, pilot runs, and full-scale production.
Finished, Assembled, and Certified Parts for Critical Industries
Certified quality management system covering stamping, secondary operations, mechanical assembly, and finishing processes to ensure consistent production, documented inspection, and continuous improvement.
Authorized under International Traffic in Arms Regulations (ITAR) to handle and process controlled defense and aerospace components with secure documentation and traceable workflows.
Provide First Article Inspection Reports (FAIR per AS9102/ISO standards), Production Part Approval Process (PPAP Levels 1-3) documentation, and lot-level material and process traceability to support customer validation, regulatory compliance, and quality audits.
Offer process validation and verification including capability studies (Cp, Cpk), dimensional inspection (CMM reports), functional/mechanical testing, and material certification (ASTM, AMS, ISO standards) to meet industry-specific compliance (e.g., FDA, ISO 13485, AS9100, IATF 16949).
Type: Major Tier-1 defense contractor supplying subassemblies for secure military communications and avionics systems
Stage: Preparing for LRIP (Low-Rate Initial Production) on a new encrypted field communication module for U.S. military deployment
Team: Cross-functional team of 6 design engineers, 2 manufacturing engineers, and 1 quality manager coordinating with multiple approved suppliers
Primary Need: Deliver a fully finished EMI shield cover—stamped, plated, fastener-installed, serialized and marked—meeting MIL-STD-130 identification, ITAR control, and DFARS material compliance within a 6-week qualification deadline to support First Article Inspection and initial production approval
Required a stamped aluminum EMI shield (5052-H32, 0.040” thick) with:
• 4 PEM fasteners pre-installed for automated chassis assembly
• Nickel plating per MIL-DTL-26074, Class 1, Grade A for conductivity and corrosion resistance
• Laser-etched marking per MIL-STD-130 including NSN, CAGE code, and serialization
Needed to hold ±0.002” hole-to-bend tolerance for precise fit in enclosure assembly
Had to eliminate post-processing steps to reduce supplier chain delays and maintain ITAR-controlled workflow
Gromax engineered a progressive die integrating in-die piercing, coining, and deburring to achieve plating-ready, burr-free edges meeting plating adhesion specs
Performed die simulation to validate material flow and eliminate stress cracking at bends under tight radii
Completed stamping, nickel plating (MIL-DTL-26074), PEM fastener insertion (per NASM45938), and laser marking (MIL-STD-130 UID format) entirely in-house under ITAR control
Delivered First Article Inspection Report (FAIR per AS9102) with complete CMM dimensional validation, material certs, plating cert, fastener lot traceability, and serialization record
Eliminated two outside vendors (plating and fastener insertion) previously used in prototype builds
Delivered FAIR-approved, LRIP-ready parts 10 days ahead of deadline to support production readiness review
Reduced total lead time by 38%, eliminated logistics risk, and consolidated all compliance documentation under a single supplier
Enabled customer to proceed directly to pilot build with approved production process and documented traceability
From stamping to plating, marking to assembly—Gromax simplifies your supply chain.